Call held on .
NHPC delivered strong operational growth as Q2 revenue rose 33% YoY to ₹4,482 Cr and PAT jumped 52% to ₹1,549 Cr, driven by Parbati-II turnaround, Teesta-V restart, and 5 commissioned Subansiri Lower units. Generation grew 17% with PAF reaching 92.2%. Management maintained FY27 capex at ₹14,300 Cr and guided FY28 EBITDA to reach ₹10,000 Cr and PAT to ₹6,000-6,400 Cr as 1,745 MW commissions in FY27. Annual equity needs of ₹4,000 Cr are fully covered by internal cash flow with zero fresh dilution.
Management maintained its aggressive capacity commissioning and capex roadmap, reiterating FY27 capex guidance at ₹14,300 Cr, same as mentioned in last call, with subsequent annual capex guided at ₹14,000-15,000 Cr. Total capacity addition of 1,745 MW is targeted for FY27 across Subansiri Lower units, Kiru (624 MW), and Rangit-IV (120 MW), paving the way for FY28 EBITDA to reach ₹10,000 Cr and PAT to reach ₹6,000-6,400 Cr. Regulated equity will expand substantially as Subansiri Lower (₹9,000 Cr equity) and Parbati-II (₹4,000 Cr equity) move to full tariff billing. The 10-year capex plan of ₹1,11,000 Cr requires ₹40,000 Cr total equity, which management confirmed will be 100% funded through internal cash accruals of ~₹4,000 Cr annually with zero equity dilution.
NHPC delivered a 3,766 Cr profit for FY26, up 25% YoY, driven by the successful commissioning of Parbati-II and initial units of Subansiri Lower. While the headline growth looks impressive, the bottom line was heavily padded by a one-time tax reversal of 900 Cr. Management sounds extremely bullish, guiding for its regulated equity base to nearly double to 30,627 Cr by FY27. Despite maintenance shutdowns at Teesta-V impacting availability, the massive capacity pipeline makes this a high-conviction growth story.
Q4 FY26 earnings call, 18 May 2026 note
NHPC reported strong 9M results with revenue up 10% to ₹8,800 Crores and PAT up 7% to ₹2,306 Crores YoY, driven by 15% higher generation due to the newly commissioned Parvati-II project. Quarterly revenue dropped slightly due to a high base effect last year. Management is confident about project execution, setting a substantial CapEx guidance of ₹15,000 Crores for FY27. Project commissioning like Subansiri Lower (2,000 MW) is progressing rapidly, serving as a major structural tailwind.
Q3 FY26 earnings call, 6 Feb 2026 note
NHPC reported a significant annual Profit After Tax (PAT) decline of approximately 17% YoY to ₹3,084 Crore, primarily driven by a 9% drop in generation due to the Teesta-V flood shutdown and one-off employee benefit arrears (₹354 Crore increase). However, Q4 PAT rose 29% QoQ to ₹894 Crore, aided by a water cess reversal. Management was highly focused on project execution, announcing that Parbati-II (800 MW) is fully operational, adding ₹2,000 Crore in annual revenue, and confirmed the massive Subansiri project is on track for partial commissioning by June '25, providing a structural long-term tailwind. The overall tone was confidently focused on expanding capacity and execution.
Q4 FY25 earnings call, 1 May 2025 note
NHPC Limited Q2 FY27 results and concall · NHPC Limited Q4 FY26 results and concall
NHPC Limited concall notes · NHPC Limited results, shareholding and filings · All concalls